Plant FP-924 · 2,952 kWp · 4,840 modules

Cleaning savings audit

Routine cleaning saves about ₹0.91 L a year, not ₹3.65 L. The earlier figure is the top of a ₹0 to ₹5.54 L range.

Verdict. Scenario B is the headline.

Realistic net savings₹0.91 La yearScenario B
Cleaning interval31dry days4 rounds a year
Range, A to C₹0–5.54 La yearSet by the dust rate
Earlier figure₹3.65 La yearUpper bound only

Downtime costs more than dust

Inverter trips, derates and days with no output lost 81,735 kWh in 295 days. Cleaning cannot recover it; fixing faults faster can.

Lost to downtime, 295 days81,735kWh₹6.33 L at ₹7.75/kWh
Lost a year, pro rata₹7.84 La year8× what cleaning saves in B
Share of the plant's energy2.16%130 events, 1 Feb to 22 Nov 2026
Worst blockCarport38,193 kWh lost

Why ₹3.65 L is the upper bound

It rests on a 0.258 %/day dust rate from step detection. After the detected cleanings, output stays flat (-0.003 %/day) instead of falling 0.215 %/day.

Questions and answers

QuestionShort answerVerdict
Existing calculationsEquations mostly right; the 0.258 %/day rate and the observed interval come from noise-driven step detection.Overstated
Are dust losses underestimated?No. Rain tests cap plant-wide dust near 2.3 % after 21 to 42 dry days.Not underestimated
ScenariosA ₹0, B ₹0.91 L, C ₹5.54 L net a year.B most credible
Interval and break-evenB: clean every ~31 dry days (4 rounds a year); pays only below ₹10.7 a module.Whole-plant schedule
Biggest driverDust rate (swing ₹5.17 L), then cleaning cost and the rain threshold.Rate must be measured
Physical validity12 logger-dump days, the portal's POA is really GHI, 27 cleanings are fault recoveries.Fix data flags
RecommendationPresent B as the headline, A to C as the range, and a 60-day measurement plan.Measured range

Scenarios A, B and C. One year of real rain, best interval each.

ScenarioDust rateDust loss a yearRecoveredIntervalCost a yearNet a year
A · Conservative0.050 %/day, saturating at 3 % Inferred27,936 kWh (0.66 %)0 kWhNo routine cleaning₹0₹0
B · Realistic0.100 %/day Inferred72,391 kWh (1.72 %)26,732 kWh31 d, 4×₹1,16,160₹91,011
C · Upper bound0.258 %/day Hypothetical1,88,655 kWh (4.48 %)1,16,417 kWh16 d, 12×₹3,48,480₹5,53,751
InputValueBasis
Energy a year4,210,888 kWh from the plant meterMeasured
Dust rate A and BRain jump ÷ dry days: 2.2 % ÷ 42 d and 2.3 % ÷ 21 dInferred
Dust rate CThe existing 0.258 %/day, 100 % removed by each cleaningHypothetical
Rain wash5 mm or more removes 90 % (3.4 mm did nothing, 6.5 mm did)Inferred
Tariff and cleaning cost₹7.75/kWh and ₹6 a module (₹29,040 a round)Assumed

Break-even at ₹10.7 a module

B pays only while a cleaning costs less than ₹10.7 a module; the audit assumes ₹6 (₹29,040 a round). Under 15 days, A and B lose money.

Break-even, scenario B₹10.7a moduleNet ₹0.91 L at ₹6
Break-even, scenario A₹3.2a moduleBelow the assumed cost
Break-even, scenario C₹29.4a moduleCleaning every 16 days

Inputs that move the panel savings. The dust rate outweighs the rest.

Net savings of B at each input's low and high value. The thin line is the base case, ₹0.91 L; light bars fall below it, dark bars rise above it.

Dust rate (0.05 / 0.258 %/day)Low ₹0High ₹5.17 L
Cleaning cost (₹12 / 3 per module)Low ₹0High ₹1.70 L
Rain needed to wash (3 mm / 10 mm)Low ₹0.32 LHigh ₹1.71 L
Electricity value (₹5 / 10 per kWh)Low ₹0.17 LHigh ₹1.53 L
Dust saturates at 3 % (yes / no)Low ₹0High ₹0.91 L
Interval fixed at 15 / 62 days (optimum 31)Low −₹0.58 LHigh ₹0
Share of dust a cleaning removes (80 % / 100 %)Low ₹0.58 LHigh ₹1.02 L
Plant availability (95 % / 100 %)Low ₹0.81 LHigh ₹0.91 L
Median of 1,500 runs₹0.69 La year5th to 95th percentile: ₹0 to ₹3.70 L
Runs where cleaning does not pay27%Every input drawn across its range

Plant data problems

FindingDetailBasis
Detected cleanings are not a cleaning log169 events at a 3.5 % threshold, about 1.5× the 2.3 % daily noise; noise alone gives 35.Inferred
27 cleanings are fault recoveriesThey come within 30 days of one of 52 output drops and are counted as dust.Calculated
Step size does not grow with daysr = 0.035 (p = 0.71) between step and days since the last reset.Calculated
The POA sensor reads horizontal sunlightIts readings track GHI; portal PR reaches 100 to 118 % on 3 to 10 Nov 2026.Measured
12 inverter-days are logger dumpsAbove 7.2 kWh/kWp (max 9.99); flag and drop them.Measured

Measurements to confirm scenario C

Sixty dry days of these turn the range into one measured number.

DataWhyHow
Crew cleaning logTrue interval and cost, replaces detected eventsO&M team: date, block, modules, water, ₹
Clean and dirty reference modulesDirect dust rate, including saturation2 to 3 roofs, one module cleaned daily, 60+ dry days
Pyranometer cleaning log and a tilted reference cellRemoves sensor-dirt maskingClean the sensor daily during the test
String or MPPT current around a cleaningMeasured step per block5-minute data, 3 days each side
Tilt, azimuth and string layout per blockCorrect transposition and shadingSite survey
Inverter alarm logSeparates faults from dustAsk the vendor; the portal has none
Real cost a module and avoided tariffEconomicsCrew invoices, PSPCL bill